Aqueduct Installations

AQUEDUCTS

The Pelton and Banki turbines Esscom, special for hydroelectric plant installed on aqueduct, reply to the legislation about the manufacturing process and materials usable in contact with water for human consumption governed in Europe by the European Directive 98/83/CE, in Italy DM 174/2004.

Compliance with D.M. 174/2004 is certified by a Third-Party Organization.

Today an interesting opportunity is represented by the aqueduct installations, where the drinking water is bringing into pressure pipe and the turbine can be placed into the existing plant with the aim of energy recovery, which otherwise will be dissipated, transforming it into electricity.


Considering the extreme importance concerning the public health, for the specific aqueduct installations, Esscom supplies hydroelectric turbines that, thanks to suitable materials, industrial process and specific controls comply with the regulations in force on materials that can be used in contact with water intended to human consumption.
In this specific sector, we claims more than 100 installation In UK and abroad.

Esscom supply Pelton and Banki turbines specific for installation on aqueduc in compliance with the legislation on processes and materials that can be used in contact with water intended for human consumption regulated in Europe by the European directive 98/83/CE.

ECOWATT HYDRO turbines are certified according to:

  • Risk analysis
  • Tracking of certified materials
  • Migration test
  • Certification of production standards
  • Specific Manual